Interior design
Free on-site inspection and evaluation
Feel free to make an appointment with us for on-site inspections.
Interior design is an important part of today’s life. It can be designed to renovate the decor to enhance the perception, thereby attracting more customers, or by improving the deficiencies of the previous design, using up the space of Hong Kong’s gold and soil, and at the same time overhauling due to various factors. Part of it. The interior design service provided by the company is designed by experienced designers to understand the needs of customers and design beautiful and practical designs for their properties.
Southern District Cape Bo Tao Xiaozhu
本公司曾為南區舂臼角柏濤小築作室內設計,將其35年樓齡之物業進行現代化翻新設計。由前台位置等設施作重新鋪排、改善燈光照明帶出舒適感、再加上將走道牆身再重新設計,為原本老舊的設施帶出現代感及優雅風格並重之設計。並同時依客戶要求改善物業內設施,為柏濤小築注入一股全新氣息。
Previous
Next
Price Reference (from 1-1-2019 to 31-12-2019)
Labour and material cost inflated from 2016, prices are thus modified.
False Ceiling
Project Content | Unit price | Unit |
---|---|---|
painted aluminum plate false ceiling | 60 | square feet |
Checkered soundboard false ceiling | 72 | square feet |
Checkered gypsum board false ceiling | 80 | square feet |
Checkered mineral wool false ceiling | 70 | square feet |
Featured wood splint false ceiling | 75 | square feet |
Gypsum board false ceiling | 70 | square feet |
light slot | 480 | feet |
Wood Engineering
Project Content | Unit price | Unit |
---|---|---|
Wood splint partition wall | 75 | square feet |
Gypsum board partition wall | 43 | square feet |
Car grinding crystal wood floor | 25 | square feet |
Pave solid wood flooring | 42 | square feet |
Pave a seamless floor | 33 | square feet |
Pave the wooden floor | 48 | square feet |
Plumbing System
Project Content | Unit price | Unit |
---|---|---|
hidden throat | 900 | One |
Ming throat | 750 | One |
Room sewage throat | 1200 | One |
Painting works
Project Content | Unit price | Unit |
---|---|---|
Shovel paint bottom, smash-proof oil | 5 | square feet |
Spray rock paint | 33 | square feet |
spraying 麻石漆 | 33 | square feet |
Powder ash, enamel latex paint | 14 | square feet |
Dashing, wallpapering | 18 | square feet |
External wall painting | 11 | square feet |
Ceiling cable painting | 20 | feet |
Wood floor cable painting | 20 | feet |
Wood handle painting | 120 | feet |
Barier painting | 150 | feet |
Doorway painting | 700 | set |
Tricky page | 600 | set |
Mud water project
Project Content | Unit price | Unit |
---|---|---|
muddy waters | 28 | square feet |
Red brick, sand brick building | 55 | square feet |
Red brick, sand brick flat build | 75 | square feet |
Light Brick | 50 | square feet |
Play water fabric | ||
floor tiles | 32 | square feet |
floor mosaic | 38 | square feet |
Platform marble | 42 | square feet |
Wall Tiles | 34 | square feet |
Wall mosaic | 42 | square feet |
Wallstone Marble | 48 | square feet |
Foot line | 20 | feet |
Demolition work
Project Content | Unit price | Unit |
---|---|---|
clearing false ceilings | 900 | well |
Unpacking kitchen miscellaneous | 2500 | set |
Clean bathroom miscellaneous | 1200 | set |
clearing the partition wall | ||
Brick wall (100mm) | 2500 | well |
Concrete wall (100mm) | 6500 | well |
Removing the fabric tiles | 1700 | well |
Aluminum window engineering
Project Content | Unit price | Unit |
---|---|---|
Aluminum window grille | 450 | set |
Anti-mosquito net | 85 | square feet |
Wooden door
Project Content | Unit price | Unit |
---|---|---|
Single wooden door | 3400 | set |
Single wooden door | 4200 | set |
Multiple wooden doors | 1800 | feet |
Wooden folding door | 2200 | feet |
Hide single wooden door | 6800 | set |
Double wooden door | 8800 | set |
Double wooden door | 8500 | set |
Glass door
Project Content | Unit price | Unit |
---|---|---|
glass cover door | 5800 | set |
Glass Doors | 8800 | set |
Aluminum bus door | 1900 | set |
Aluminum cover door | 3500 | set |
Aluminium door
Project Content | Unit price | Unit |
---|---|---|
Aluminum folding door | 1850 | feet |
Aluminum Gate | 1100 | feet |
Customized kitchen cabinet | 2300 | feet |
Electricity project
Project Content | Unit price | Unit |
---|---|---|
swtich (concealed conduit) | 850 | set |
Switch Description Throat Position | 750 | set |
Single-phase electric main box (60A) | 6500 | set |
Three-phase electric main box (100A) | 8800 | set |